Projects

Signature Project — 50 MW Hybrid Power & Data Campus

A shovel-ready campus that blends renewable and firm generation to power AI, cloud, and industrial compute. Designed for concurrent maintainability with Tier III intent and future-proofed interconnect capability.

Key Metrics: 

50 MW Power Capacity 

20–30 MW Tier III IT Load

✓ 200 acres Industrial Land

Generation Mix: 

50% solar

35% gas

✓ 15% storage

Development Pathway

Site Control

LOI/option, title verification, environmental screening, preliminary layout. e Control

Engineering & Permitting

Interconnect studies, geotech, air/stormwater permits, single-line diagrams.

Commercialization

Achieve shovel-ready status and execute buyer/EPC hand-off.