Projects
Signature Project — 50 MW Hybrid Power & Data Campus
A shovel-ready campus that blends renewable and firm generation to power AI, cloud, and industrial compute. Designed for concurrent maintainability with Tier III intent and future-proofed interconnect capability.
Key Metrics:
✓ 50 MW Power Capacity
✓ 20–30 MW Tier III IT Load
✓ 200 acres Industrial Land
Generation Mix:
✓ 50% solar
✓ 35% gas
✓ 15% storage
Development Pathway
Site Control
LOI/option, title verification, environmental screening, preliminary layout. e Control
Engineering & Permitting
Interconnect studies, geotech, air/stormwater permits, single-line diagrams.
Commercialization
Achieve shovel-ready status and execute buyer/EPC hand-off.